PPRuNe Forums - View Single Post - Sackings at Emirates
Thread
:
Sackings at Emirates
View Single Post
25th Jun 2004, 16:14
#
76
(
permalink
)
Engineer
Join Date: Nov 2000
Location: Home
Posts: 903
Likes: 0
Received 0 Likes on 0 Posts
Is it feasible that the performance calculations were made and set for the full length runway.
Then not readjusted for an intersection takeoff. If this was the case at a high elevation airport this would manifest itself as a considerable problem.
Engineer
View Public Profile
Find More Posts by Engineer