I would suggest that, in the absence of a serviceable APU, you do need to power down Engine #2 first, to enable ground power to be connected. When that is online, you can power down #1.
I would also suggest that the FCOM checklist is not a "Read and Do" list, nor is it telling you in what order the engines should be powered down, but is simply telling you to check that you have powered both down.