On the bottom of our loadplans it clearly states:
I certify that this cargo load plan has been executed and loading verified in accordance with company policy.
Then there is a space for the ramp lead to sign off with emp number.
This is then stored with the loadsheet (load sheet only signed by the loadplanner responsible) and kept on file.