Boss Raptor,
> in some cases doing away with a C Check altogether...then we have MSG 2 and MSG 3
I canīt see the link between setting up a Maintenance Schedule without a C check (or even without letter checks at all!) and MSG-3... (not familiar with MSG-2 though)...?!
Can you please elaborate on this.
Cheers,
J.V.