PPRuNe Forums - View Single Post - Stansted-4
Thread: Stansted-4
View Single Post
Old 28th May 2026 | 20:32
  #1686 (permalink)  
JW95
5 Anniversary
 
Joined: Sep 2019
Posts: 459
Likes: 15
From: Italy
STN TP and TTS routing

Hope you’re all well 🙂

Just wanted to ask if anyone in the know at STN has any updates on the terminal transformation project/extension/satellite refurbishment progress please?

Further, I’ve noticed recently some changes to signage in the terminal recently re. The TTS routing. It seems that now, the transit system serves SAT 1 exclusively, as the electronic signage as well as the yellow banner now reads ‘shuttle to gates 1-19’ rather than 1-39. It seems as though access to SAT 2 is now done solely via the walkway en route to gates 81-88, as signage has been changed here also. Anyone know if this is temporary, or has the TTS now permanently stopped serving the upper level of SAT 2? I am aware that alternate access to gates 20-39 has always been put in place as a contingency measure during times when the TTS has been out of use or in maintenance, but this is the first time I’ve noticed all these signage changes and the fact that signs to the shuttle train no longer signpost passengers to access gates 20-39 via the TTS.
JW95 is offline  
Reply