PPRuNe Forums - View Single Post - Documentations sa 365 c2
View Single Post
Old 8th March 2026 | 10:51
  #7 (permalink)  
ericferret
20 Anniversary
 
Joined: Dec 2005
Posts: 1,581
Likes: 73
From: England
Originally Posted by VDL.aero
We are interested in the manufacturing process and the job cards for removing and reinstalling it on the helicopter,
as well as its AMM and SRM on the ATA 53 and 33.
The books concerned are the SA365C MET and MRR. Again I would contact Airbus product support. Alternatively try to find someone who operates or has operated the type recently. For manufacturing you need to speak to the factory. I think there will not be much in the MET as installation is straight forward 5 screws at each end and the two support brackets in the middle with reference to disconnecting the landing light and radio aerial(?). Removal will add taking down the side panels first. The MRR may well just refer to standard practices for repair as the panel is a simple sheet metal structure..
ericferret is offline  
Reply