Originally Posted by
FH1100 Pilot
Goldstein must be VERY optimistic that the FAA will create rules in his favor.
The FAA already has for powered-lift pilot and operations requirements with Part 194. And once the Joby and Archer complete the eVTOL certification process in the next 12-18 months, a new eVTOL aircraft certification Part XX should be released as an NPRM in the following months.