Originally Posted by
Biggus
One has to wonder why it took 3 weeks to get a team out there.
Indicative of lack of expertise/experienced personnel/equipment?
What spares are required? What was the availability of the required spares? Has this repair been done before? Was the design authority required to assess/design/approve the repair scheme? Were specialist or bespoke tooling required? Et cetera