PPRuNe Forums - View Single Post - Takeoff run
Thread
:
Takeoff run
View Single Post
22nd January 2025 | 11:31
#
13
(
permalink
)
safetypee
Joined:
Dec 2002
Posts:
2,775
Likes:
353
From:
UK
+- 30ft certification requirement, with appropriate control input, after engine failure recognition, on a dry runway, without crosswind.
In operations - surprise +
if
the above do not apply,
then
check grass.
Reply
0
0
safetypee
View Public Profile
Find More Posts by safetypee