PPRuNe Forums - View Single Post - Engineering Challenges Facing New VTOL Aircraft
Old 29th June 2024 | 02:21
  #44 (permalink)  
wrench1
15 Anniversary
 
Joined: Oct 2006
: A&P
Posts: 1,348
Likes: 271
From: USA
Originally Posted by CTR
The eVTOL startups are dreading the prospect of being held to the same stringent standard for certification as the 609. “It appears the FAA intends to certify the AW609 as a special class aircraft under FAR 21.17 (b) and before issuing formal powered-lift airworthiness standards, the latter widely anticipated in 2024 and that will largely impact eVTOL aircraft.
FYI: There will be various powered-lift aircraft certification catagories based on various requirements. So an eVTOL will not be certified under the same rules as a tilt-rotor.

The issue was the FAA planned to certify powered-lift under the existing Part 23 rules whereas EASA planned to create a new certification rule. The FAA finally realized their "error" and 2 years ago elected to create a new route similar to EASA.

The FAA special class process as been around for years and is a catch all for new aircraft certification that does not completely fit into an existing FAR. For example, the Bell 525 has a special class for its FBW system.

Regardless, with this new commonality between FAA/EASA eVTOL cert rules there are several recently release guidance documents that show eVTOLs will have their own specific requirements to meet. But from what I've seen I dont expect any formal FAA/EASA eVTOL full certifications until 2028. Interesting times ahead.
wrench1 is offline  
Reply