PPRuNe Forums - View Single Post - AUKUS
Thread: AUKUS
View Single Post
Old 19th April 2024 | 06:01
  #1583 (permalink)  
Going Boeing
20 Anniversary
 
Joined: Jun 2001
: ATPL
Posts: 1,898
Likes: 17
From: South Pole
Originally Posted by Xhorst
However, the clock doesn't stop when we get to 8 SSN-A's.

Hopefully, Australia will learn that the smart way to build big things like subs is to always have one on the production line. If they have a 33-year lifespan, we need to be building one every 4 years. When we need a newer model down the track, we modify the existing production line. Not close it down, sack everyone and then go "oh, wow, look how much it's gonna cost us to start a whole new sub-building industry again".
Yes, it needs to be a continuous build. In an ideal world, both the RN & RAN would operate 9 SSN’s each + the RN would have 4 SSBN’s, then, with a 33 year reactor life and a 3 year drumbeat, Barrow could build 7 SSN’s & 4 SSBN’s while Osborne would build 11 SSN’s - I know, IT WILL NEVER HAPPEN!
Going Boeing is offline  
Reply