Standard ops for us too. Read and do from the QRH by PM with a cross check of the correct engine master by PF. Both the before start and after start procedures are in the QRH so no after start checklist for us.
European airline, 100+ shorthaul Airbus.
Last edited by Locked door; 7th Apr 2024 at 14:47.