Originally Posted by
LTNman
Gatwick is going through its DCO examination to expand. Luton is waiting a DCO decision to nearly double in size while Stansted has permission to substantially grow. So where is the constraint that will allow Southend to flourish?
It's not just terminal capacity, but runway/air traffic control capacity - and SEN can offer slots at peak times, not just backfilling between waves.