Terminal Expansion
It would appear that some significant changes lie ahead at EDI in the next 3-4 years. Described as creating a much expanded area for international flights. Another add on really with the terminal being extended north from gates 4-11. Most domestic flights will be handled through gates 1-3. Presumably the extension will be dual level, similar to Heathrow allowing departing and arriving flights to be handled at same time without disruption, New airbridges at gate 7 and 8? As suggested in previous posts, airbridges attached to terminal past gates 19 creating stands for wide body aircraft. The expansion northwards presumably would create the space for gate rooms? The work would have to start soon to meet this time-line?
https://www.msn.com/en-gb/travel/new...%20responsible.