PPRuNe Forums - View Single Post - ATC contributed to 15% of flight delays in December
Old 12th Jan 2024, 07:42
  #14 (permalink)  
airdualbleedfault
 
Join Date: Apr 2010
Location: home
Posts: 518
Received 23 Likes on 10 Posts
Originally Posted by Johnny_56
To be fair - it means 85% of delays aren’t due to ATC…

****ty infrastructure, outsourcing, lack of crew, weather.

Is 15% an unusual number? ATC delays into Perth are crazy at the moment (especially in busy days), but then they have to work with a single runway half the time, no high speed taxi-ways, half of the flights have to drag their arses down to ‘D’ to vacate. The infrastructure is terrible - at least in Perth
I was going to call BS on the 15%, but as someone pouted out that's probably only departures, if it was arrivals it would be over 50% in Perth.
Gatwick handles roughly double the number of aircraft movements as Perth with 1 runway, far more complex and busy airspace and mostly worse weather. Yes I can hear all the BS excuses about high speed taxiways etc but really, 1 runway with high speed taxiways is better than 2?
Let's not try to polish a turd here, some bright sparks in ASA hierarchy have decided their KPIs are more important than moving air traffic so the ATC peeps have basically said "you give us x amount of controllers, we will handle x amount of aircraft", that comes from inside ASA.
Makes me laugh when the government gets on their pathetic little EV bandwagon meanwhile 100s of tons of avtur are being wasted each week and that's just into Perth
airdualbleedfault is offline