Originally Posted by
pabely
Probally a few years of misery though, but arn't most airports now.
I think most of the work can be done outside in, with the joining up at the end with minimal inconvenience.
The walk way can be built and also joined up practically overnight, with no need to stop the TTS.
I have witnessed 2 terminal extensions over the years and from in side the terminal you wouldn’t even know work was going on.