The 32m master plan shows 2 Alpha extensions at 25 end, only the second goes to the turning circle so I assume will require more major earthworks but the documents today also talk about piling so I assume it's not just a case of laying a foundation and concrete over the top.
Should aid flow though and go some way to relief from "you are #8 for departure" whilst waiting to depart along the Alpha Taxiway.