In the draught SSUN for the UKSAR2G contract, the "Measure of Effectiveness (Threshold)" for readiness is the same as the current state, being as follows.
"Lot 1, Lot 2 (Helicopter): 15 Minutes 08:00-22:00, 45 minutes 22:01 -07:59."
"Lot 3 (UAV): 45 Minutes 08:00-22:00, 60 minutes 22:01 -07:59."
Meanwhile, the spec the bidders were encouraged to aim for, in the next column, was as follows.
"Measure of Effectiveness (Objective)"
"Higher Readiness State than Threshold level for both Readiness State times"
What would be nice is if this was simply a mix up with the Lot 3 figure for the UAV fleet. However, since "Discussions relating to readiness states beyond this date are ongoing." is attributed to 'an MCA spokeswoman', I remain concerned.
Remind me. How long does it take to drown?