PPRuNe Forums - View Single Post - NH-90 problems
Thread: NH-90 problems
View Single Post
Old 2nd Oct 2023, 21:03
  #304 (permalink)  
Doors Off
 
Join Date: Mar 2005
Location: The Empire
Age: 50
Posts: 250
Received 13 Likes on 8 Posts
Originally Posted by Blackhawk9
True , much of the problem with the MRH and ARH is Army originated but the difference with the 60M and 64E is they will be tied into the US Mil supply chain which has worked extremely well with the CH-47's with excellent serviceability and availability over the years which is a very complicated helo with high manpower requirements , the supply and tech support system for the ARH and MRH are unique with their tie in with Airbus, the same tie in with the 60M and 64E as the 47 should ease the whole spares and support system, and with the aircraft based where OEM support is rather than strategic/tactical reasons should help serviceability. (all Boeing products 47F and 64E based in Townsville with large Boeing support facility there and all Lockheed Martin (Sikorsky) products based down south, Oakey and Holsworthy for 60M and just down the road from Holsworthy at Nowra for the Navy's MH-60R's. We have very good serviceability rates with the MH-60R (Sik)so should carry over to the 60M (Sik)and the same with the 47F (Boeing) should work with the 64E (Boeing)
Here is hoping that the logistical co-location potential is realised. The "green" workforce impacts will be interesting. As for Romeo serviceability, it is not as good as you think. They are struggling and have been for a while. Training is taking far longer than it should and hours are low.
Doors Off is offline