Originally Posted by
STN406
SAT1 hasn't got that much space during peak departures. There are plans to look to get better gate usage out of the gates in SAT1 for next summer as its near capacity most mornings and afternoon peaks. Possibly splitting boarding gates up. For example LS1577 to HER and LS1511 to KGS both leaving at 0600 could both be boarding from the same gate area 11/12 which currently are joint together.
The Emirates lounge will be fitted out shortly in SAT1 and should be open to the back end of the year. Though this will only be usable by Emirates passengers.
SAT2 would have some space if they repurpose the small Weatherspoon's in the area. But this wouldn't be beneficial until a new link bridge to SAT2 is done as once your upstairs at the gate area its not the easiest to be able to get back if your flights leaving from elsewhere.
Many thanks for the info and updates STN406

Once the terminal extension gets the go ahead, do you know if there will be any reconfigurations done to satellite 2, considering that there will eventually be a new skylink in place to replace the existing TTS route? It would be nice to see it modernised and in line with satellite 1.