Originally Posted by
commit aviation
Based on some internal comms I have been shown the TTS is going.
I also recall a comment about completing the shoreline check-in desk conversion work which will please many.
If the TTS is going, this will be similar to what happened with the original transit at LGW, which connected the South Terminal to the satellite in the 80s before being replaced by a walkway around the early 2000s. This will mean a long walk for passengers using satellite 1!