Originally Posted by
Hughes500
Encyclo but you are stuck in the OEM way of thinking ! Remember being shown round Westlands on the EH 101 production line, it took one " engineer " over 4 hours to cable tie 2 m of loom to the aircraft !
Repeating the same tired (and personal perspective) anecdotes doesn’t make it true nor Hill’s dream any more achievable, no matter how much you wish it to be.
The few early adopters that I know have a far more realistic viewpoint, which can only happen if you don’t have brown rings round your ankles.