Originally Posted by
GoEDI
The only delay relating to EDI here was the QR B788 having to hold for a stand. Stand 16 is largely unavailable this week whilst the jetbridge that got into a fight with a QR A35K a while back is finally repaired. Therein lies the main problem today, combined with the WS B789 running half an hour late departing which didn't help.
They all happened at EDI - doesn't really matter who was 'at fault' if your system doesn't have enough capacity to cope when the inevitable sh*t happens!