No northern taxiway in this phase of construction (phase 2 I believe) and instead the current building works are concentrated on runway extension and stands 1-5 being reconfigured to accommodate x 4 320/737
Roll on Phase 2, in the mean time commiserations to the NATS Tower controllers, RWY 20 backtracks could often be a p-i-a, the extra 164 metres is going to increase the frequency of irritation.