Originally Posted by
pabely
Lets hope they don't get stung like TUI who ordered Max 10s in 2017 are are still waiting (and suffering for it). If FAA/EASA say new type mods then that will be a lot of additional costs.
One would assume they would get extra 8200’s as compensation if that were to happen.