Hi guys
Just a point about the start sequencing in DXB,when its busy everybody always seems to get started,taxied and cleared for takeoff in the sequence they called.
This is all very gentleman like but at times not very practical.Often you will have 5 departures on the same track in a row which I'm sure makes things difficult for the departure controller catching them.
Would it not make more sense to sequence traffic as much as is possible,one left turn departure ,one strait ahead,one right,one left etc.
I'm sure this would also help the ACC controllers and help everybody get there levels and reduce time between departures.Another thing that will help traffic flow is to have departures out of SHJ route north to RAK before on track to aid seperation from DXB traffic.