PPRuNe Forums - View Single Post - Luton-10
Thread: Luton-10
View Single Post
Old 3rd Feb 2023, 09:24
  #2482 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,862
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by davidjohnson6
LTNman - you mention there will be no road access to the DART as it will be barrier controlled.
Will it still be possible to enter/exit between the railway station and Kimpton Road (yes, by the hotel) without paying for the DART ? I rather like being able to save the money and walk between the airport and train station
Yes, you will be able to walk to the railway station from Kimpton Road. In fact the Dart station can also be used as a railway station so Parkway will have a railway station each side of the tracks. No rail logo on the building though.

The ground floor Dart entrance is open access to both Thameslink and the Dart with just a Thameslink gate line to platform 1. Passengers heading for platform 2 to 4 can either use the platform 1 entrance and follow the existing route to the other platforms or use the escalators and lifts to the first floor, which is also open access. From there passengers either pass through the barriers to the Dart or at the rear of the Dart station, another set of barriers to the railway lines. The second photo shows both sets of barriers.

Last edited by LTNman; 3rd Feb 2023 at 11:43.
LTNman is offline