Originally Posted by
willy wombat
I find it impossible to believe that you could build that taxiway (even then) for circa £40k. Are you sure that that wasn’t just for the asphalt topping and excluded the substantial foundation necessary to achieve an appropriate LCN?
PCN35 already on taxiway A/B so same load bearing I assume would be used for taxiway C