Originally Posted by
SKOJB
As I mentioned previous, it seems from the latest S106 that no additional planning is required for this taxiway and therefore it would surely be remiss not to add a bit more tarmac out from stand 14 to runway with equipment already being on site
With the possible exception of the Permitted Development Rights that you mention, exactly the scenario when the runway was being re-surfaced - the last missed opportunity. An informal chat with the then on-site contractor indicated that with everything in place, including the on-site asphalt production plant, the cost at that time - circa £40K!