Originally Posted by
NutLoose
The advantages I can see of Challenger is, cometh the night, cometh the advantage.
A question for those expert in this sort of thing. Is the critical thing for this the support capability? I presume that there must be a minimum sensible support provision, which should then define the minimum number of MBTs to send. Is that correct? It seemed to me that ought to be the first 'calculation'.
Presumably we do have reserve support equipment available. I have no idea how complex that is in total, or how much stuff is needed. Are we talking the equivalent of RE or REME workshops being required?