Originally Posted by
Chu Chu
It looks like there was a rigid span bridging three piers (?) If so, and if the span got severed toward one end, the resulting cantilever load might cause it to buckle at the center pier. And the far end might get pulled off the third pier somewhere in the sequence?
Four spans between five piers, between expansion joints at either end of the four span section. See my post #10379