Money will be an issue, but whilst finding it there are other things to be done before real money has to be committed.
Much better to sit in Pompey investigating till the problem is clearly defined. At the same time check out the other shaft. Then sort out the fix needed and get the necessary repair kit designed, and made, and the installation job planned. Also make preps for a long tow, or to steam on one shaft, to a dock.
All much easier if done thoroughly rather than at the rush.
Old bull, young bull stuff.
N