PPRuNe Forums - View Single Post - AUKUS
Thread: AUKUS
View Single Post
Old 19th September 2022 | 20:31
  #1049 (permalink)  
Flap Track 6
15 Anniversary
 
Joined: May 2007
Posts: 243
Likes: 42
From: South Glos
The SSN(R) project is being run specifically as an RN/RAN UK/Australian joint project. They will be built in both countries to a common design and the sub will be designed to be able to include Australian specified equipment, systems and weaponry.

They won't be available before circa 2040 so expect an interim Collins class life extension & capability upgrade program.
Flap Track 6 is offline  
Reply