How did the ADF end up making decisions to end up with the NH-90 in the first place?
I suspect the local work offset in construction was the deciding factor, four being manufactured in Europe, and 42 being manufactured locally by Australian Aerospace (an Airbus Helicopters subsidiary) in Brisbane. I think "manufactured" in the article I got the detail from may be loosely used.