Originally Posted by
dsamole
Wont connect to the ECML, it will be done from the Lincoln line.. ECML connection was £200m - Lincoln Line £30m..
Cannot see it happening as PEEL are continuing ram it into the ground on a daily basis with their own agenda for warehousing.
The latest update from the Doncaster mayor sounded more hopeful. Unfortunately, your post doesn't sound as optimistic!