New airbridge for A13 Gate 12. The airbridge is completed and awaiting the Emirates treble on Monday. It is now a two bridge gate with the newly fitted bridge being able to go to the second door of wide body aircraft and the second deck of a A380.
It’s of a very similar design to the current bridges fitted to SAT1 so it didn’t look of place.
The new bridge won't be used for the first few days. It is nearly ready but a few things delaying the final handover