Originally Posted by
GeeRam
I got 33.5m kg based on 1420m long by 20m at 1180kg per m2 at 150mm thick.
I doubt Ukraine will want to take out the hydro-electric plant crossing, but they could keep targeting the roadway at the north end where the road is built on a causeway up to the dam structure.
Yeah, you're right. I did the calc in pounds/feet and then converted to metric. Early morning, must have made an error somewhere.