Originally Posted by
daz211
Of cause satellite 4 would come before satellite 5.
Do not rule out the location of satellite 5, even though it was a while back the plans were there.
also the TTS already goes but does not stop to the cargo area in question so no issues with transportation to and from satellite 5.
The TTS does not loop round under the cargo area. Like mentioned above it loops under the Alpha cul d sac.
Also TTS is built up to SAT3 and what would be SAT4. But no stations where actually built and track only running up to SAT3 with an empty tunnel after that towards what would be SAT4
Seriously where do or are you getting your information?
We won’t have a SAT5 as a second terminal would be built before then and the connecting Satellite buildings or piers would be renamed.