PPRuNe Forums - View Single Post - Wizzair
Thread: Wizzair
View Single Post
Old 20th Jun 2022, 10:20
  #461 (permalink)  
londonDriver
 
Join Date: Apr 2022
Location: London
Posts: 9
Likes: 0
Received 0 Likes on 0 Posts
Originally Posted by EchoMike62
Hello all,

I got the email almost 2 weeks ago that I passed the assessment. I would like to know how long you have to wait in the Holding Pool to get a start date, contract etc. and how long the type rating and line training takes?

I would be very happy to receive a reply

Thanks in advance
In my case, I waited 3 weeks (NTR CPT) to get the assessment result and then about a week to get the start date.

The type rating is about 6 weeks and then it's 3 weeks OCC (after a couple of weeks of home studying).

I am not sure about the line training

londonDriver is offline