PPRuNe Forums - View Single Post - Boeing Moving HQ to Washington D.C.
Thread
:
Boeing Moving HQ to Washington D.C.
View Single Post
6th May 2022, 04:26
#
8
(
permalink
)
theFirstDave
Join Date: Sep 2016
Location: Rochester,NY or SoCal
Posts: 21
Likes: 0
Received 0 Likes on 0 Posts
From the NPR story:
Quote:
The FAA took nearly two years — far longer than Boeing expected — to approve design changes and
allow the plane back in the air
.
Shouldn't that be
"Boeing took over two years to admit, identify, check, test, verify and get certification of the design changes that should been done before the MAX was placed in service.
"
Or have I strayed off topic?
Reply
theFirstDave
View Public Profile
Find More Posts by theFirstDave