A good point, and certainly something to consider. My recollection of Mumbai is that the turning area was long enough to fit the entire length of the jet into the area before executing the turn....but I could be wrong, being that it is usually 0200. At last look, it appears they are serious about extending the taxiway all the way out to the approach end of 27.