Originally Posted by
Uplinker
Where is this stipulation? I did a word search of my manuals, and checklists, (which might be out of date), and did not find it.
We continued checking weather while in the ETOPS/EDTO segment, and if an ERA went out, a re-route might be required.
I think I got this from Get into grip with ETOPS from Airbus.