Pier 6 Extension
During the height of the COVID-19 pandemic Gatwick Airport Limited put on hold the construction of the North Terminal Pier 6 extension which would have allowed for up to severn extra gates with airbridges. If and when this project resumes or more to the point if it had been completed would it have been enough to have accommodated those extra flights planned by easyJet that are scheduled for the South Terminal.