Originally Posted by
rattman
Have you actually bothered to read anything or watch the press conference ? Part of the deal the subs will be built in australia, specifically at osborne ship yards in adelaide. While we dont know the specifics as they have allocated 12-18 months to determine the design / winners. It believed that the a nuclear power plant will be built which ever countries sub is selected. Will be shipped to australia as a sealed black box where it will be installed onto the sub. The majority of the sub will be built in adelaide with US/UK technical support. I assume the overal program will be managed by electric boat the same way they did with the astute program
That is what we call "Aspirational". No one knows what's going to happen yet.