Follow the AMM Chapter 26 (Fire Protection) procedure with associated warnings and cautions if you are an engineer. If not, leave it to your engineers unless you have a specific FCOM procedure to use it.
It injects a simulated ASD signal so warnings, functions and indications can be checked by BITE test.
Last edited by Tom Sawyer; 20th September 2021 at 01:09.