Not suggesting the airport is loosing sleep, moreover the need to reconfigure stand capability which will obviously be carried out during extension works and hopefully assist in attracting an additional airline or two. However, it doesn't alleviate the lack of options available with apron space being limited and thoughtful planning will be required
Last edited by stewyb; 5th Sep 2021 at 11:18.