Mind blowing….
https://www.teslarati.com/spacex-sta...reakneck-pace/
SpaceX is building Starship’s first orbital-class booster at a breakneck pace
….
In that sense, it’s not a huge surprise that SpaceX’s Booster 4 assembly has quickly surpassed the pace set with Booster 3 less than a month earlier. SpaceX began stacking Super Heavy B3 around May 20th, starting with the rocket’s aft liquid oxygen (LOx) tank. Five separate stacks are required to turn the LOx tank’s 23 steel rings into a single structure – a process that took SpaceX about a month with Booster 3.
Booster 3 methane (CH4) tank assembly began a few days
after the LOx tank’s completion but proceeded far more quickly, wrapping up just a few days later. Two days after that, those two tank sections were then mated and welded together to complete Booster 3’s full ~65m (~210 ft) tall airframe.
Now, just four weeks after Booster 3 was rolled to the launch pad for proof and static fire testing, Super Heavy Booster 4 is well on its way to reaching its full ~65m height almost twice as quickly. With work beginning around July 16th, B4’s oxygen tank is now just missing an
(extremely complex) engine section and the booster’s methane tank was stacked to completion – 13 rings tall – in less than two days. That leaves SpaceX’s first potentially flightworthy, orbital-class Super Heavy booster just two stacks away from completion less than two weeks after its assembly began…..
https://www.space.com/starship-super...-section-photo
Elon Musk shows off wild plumbing for 29-engine Super Heavy booster (photo)