PPRuNe Forums - View Single Post - ENG BLEED 1+2 QRH proc A320
View Single Post
Old 14th June 2021 | 18:09
  #8 (permalink)  
saviboy
20 Anniversary
 
Joined: Oct 2001
Posts: 313
Likes: 0
From: hot tub
Thanks for the reply vilas ... Looking at Safety first mag #13, The AIR ENG 1+2 fault ECAM along with the new QRH proc. has been introduced with F8 and after.
So if RECALL Pb action step is not part of the H2F8 ECAM BLEED 1+2 fault ECAM, why include the "RCL PB....PRESS" line in the corresponding QRH proc.?

Last edited by saviboy; 14th June 2021 at 18:40.
saviboy is offline  
Reply