PPRuNe Forums - View Single Post - Luton-10
Thread: Luton-10
View Single Post
Old 7th May 2021, 18:19
  #421 (permalink)  
LTNman
 
Join Date: Jul 2002
Location: In the sticks
Posts: 9,857
Likes: 0
Received 0 Likes on 0 Posts
The Dart has an incline of 5% which is the maximum the cables can pull the trains up the hill. The length is 1.4 miles or 2.2 km yet the route contains a viaduct, bridge, cuttings and a tunnel. Nothing of the route is on flat open ground which will have bumped up the price. Add to that a submerged station at one end and first floor platforms at the other the Dart was never going to be a cheap build.
LTNman is online now