PPRuNe Forums - View Single Post - Return to Service experience
View Single Post
Old 1st January 2021 | 17:54
  #7 (permalink)  
Dave Therhino
 
Joined: Jan 2013
Posts: 263
Likes: 0
From: Seattle Area
Paragraph (m) of AD 2020-24-02 (the AD that requires the 737 Max flight control system changes) requires an "operational readiness flight" to be performed after the required modification work has been performed.
Dave Therhino is offline  
Reply