PPRuNe Forums - View Single Post - Return to Service experience
View Single Post
Old 1st Jan 2021, 17:54
  #7 (permalink)  
Dave Therhino
 
Join Date: Jan 2013
Location: Seattle Area
Posts: 263
Likes: 0
Received 0 Likes on 0 Posts
Paragraph (m) of AD 2020-24-02 (the AD that requires the 737 Max flight control system changes) requires an "operational readiness flight" to be performed after the required modification work has been performed.
Dave Therhino is offline